# Local-Doc Runtime Roadmap Design
|
|
|
|
> Date: 2026-04-19
|
|
> Parent Decision: `2026-04-19-residual-runtime-roadmap-prioritization-design.md`
|
|
> Parent Residual Bucket: `local_doc_pipeline`
|
|
> Status: Draft
|
|
|
|
## Intent
|
|
|
|
Define the next bounded roadmap for the five remaining `local_doc_pipeline` residuals.
|
|
|
|
This roadmap exists because official board reconciliation identified five explained structured fail-closed scenes that require local document runtime and attachment/document handling semantics.
|
|
|
|
## Fixed Input Bucket
|
|
|
|
The roadmap is limited to the five official board residuals with:
|
|
|
|
1. `currentFrameworkStatus = framework-structured-fail-closed`
|
|
2. `currentFrameworkArchetype = local_doc_pipeline`
|
|
3. `currentFrameworkNextAction = future-local-doc-runtime-roadmap-input`
|
|
|
|
## Target Scenes
|
|
|
|
1. `sweep-033-scene` / `供电可靠率指标统计表`
|
|
2. `sweep-034-scene` / `供电可靠性数据质量自查报告月报`
|
|
3. `sweep-042-scene` / `国网金昌供电公司营商环境周例会报告`
|
|
4. `sweep-051-scene` / `嘉峪关可靠性分析报告`
|
|
5. `sweep-074-scene` / `同兴智能安全督查日报`
|
|
|
|
## Roadmap Goal
|
|
|
|
Move the five local-doc residuals from generic structured fail-closed to one of:
|
|
|
|
1. runnable local-doc contract;
|
|
2. named local-doc runtime missing capability;
|
|
3. explicit non-goal that remains policy-held.
|
|
|
|
## Boundary
|
|
|
|
This design must not:
|
|
|
|
1. modify host-bridge runtime;
|
|
2. open bootstrap target normalization;
|
|
3. add a new family;
|
|
4. update the official board without a dedicated reconciliation step;
|
|
5. treat local document runtime as generic paginated enrichment.
|
|
|
|
## Required Work Areas
|
|
|
|
1. local document source evidence extraction;
|
|
2. document artifact contract;
|
|
3. attachment/input dependency modeling;
|
|
4. local pipeline execution seam;
|
|
5. fail-closed reasons specific to local-doc runtime.
|
|
|
|
## Acceptance Criteria
|
|
|
|
1. The five target scenes remain the only input bucket.
|
|
2. Each scene has a local-doc runtime decision.
|
|
3. Any implementation step remains bounded to `local_doc_pipeline`.
|
|
4. Follow-up reconciliation is explicit and separate.
|