1.9 KiB
G3 Export Plan Closure Report
Date: 2026-04-19 Parent Plan:
docs/superpowers/plans/2026-04-19-g3-export-plan-closure-plan.mdParent Route:Route 2: G3 / paginated_enrichment
Scope
This report closes the bounded G3 export-plan subgroup:
paginated_enrichment + g3_export_plan + export_plan
The implementation only recovered missing export-plan evidence. It did not continue into residual Route 2 closure work.
Implementation Slice
The bounded slice was implemented in:
src/generated_scene/analyzer.rstests/scene_generator_test.rs
The recovery logic now recognizes exportWord-style export signals as valid G3 export evidence, allowing export-plan closure without relaxing any workflow gate.
Bounded Validation
Validated scene:
sweep-002-95598-12398
Before / After
sweep-002-95598-12398Before:fail-closed / C / exportPlan = nullAfter:pass / A / exportPlan.entry = exportWord
The failed gates that previously remained:
workflow_contract_complete: export_planworkflow_complete_for_archetype: export_plang3_export_path_identified: g3_export_plan
were eliminated by the bounded export evidence recovery slice.
Coverage Delta
Fixed input count:
- before:
1 - resolved by this plan:
1 - residual after this plan:
0
Route 2 Residual
After the enrichment-request closure plan and this export-plan closure plan:
- the targeted enrichment subgroup has been resolved
- the targeted export subgroup has been resolved
- residual Route 2 work, if any, must be handled under the separate residual-contract child plan
Completion
This child plan is complete because:
- the fixed export-plan subgroup count is lower
- bounded rerun was completed
- stable
G3canonical tests were preserved
Stop Statement
This report closes the export-plan child plan.
Do not continue into Route 2 residual closure under this plan.