# G3 Export Plan Closure Report
> Date: 2026-04-19
> Parent Plan: `docs/superpowers/plans/2026-04-19-g3-export-plan-closure-plan.md`
> Parent Route: `Route 2: G3 / paginated_enrichment`
## Scope
This report closes the bounded `G3` export-plan subgroup:
`paginated_enrichment + g3_export_plan + export_plan`
The implementation only recovered missing export-plan evidence. It did not continue into residual Route 2 closure work.
## Implementation Slice
The bounded slice was implemented in:
1. `src/generated_scene/analyzer.rs`
2. `tests/scene_generator_test.rs`
The recovery logic now recognizes `exportWord`-style export signals as valid `G3` export evidence, allowing export-plan closure without relaxing any workflow gate.
## Bounded Validation
Validated scene:
1. `sweep-002-95598-12398`
## Before / After
1. `sweep-002-95598-12398`
Before: `fail-closed / C / exportPlan = null`
After: `pass / A / exportPlan.entry = exportWord`
The failed gates that previously remained:
1. `workflow_contract_complete: export_plan`
2. `workflow_complete_for_archetype: export_plan`
3. `g3_export_path_identified: g3_export_plan`
were eliminated by the bounded export evidence recovery slice.
## Coverage Delta
Fixed input count:
1. before: `1`
2. resolved by this plan: `1`
3. residual after this plan: `0`
## Route 2 Residual
After the enrichment-request closure plan and this export-plan closure plan:
1. the targeted enrichment subgroup has been resolved
2. the targeted export subgroup has been resolved
3. residual Route 2 work, if any, must be handled under the separate residual-contract child plan
## Completion
This child plan is complete because:
1. the fixed export-plan subgroup count is lower
2. bounded rerun was completed
3. stable `G3` canonical tests were preserved
## Stop Statement
This report closes the export-plan child plan.
Do not continue into Route 2 residual closure under this plan.