Files
claw/docs/superpowers/reports/2026-04-19-g3-residual-4-workflow-evidence-closure-report.md

37 lines
1.3 KiB
Markdown

# G3 Residual 4 Workflow Evidence Closure Report
> Date: 2026-04-19
> Plan: `docs/superpowers/plans/2026-04-19-g3-residual-4-workflow-evidence-closure-plan.md`
## Scope
This bounded route recovered G3 residual workflow evidence for four fixed paginated-enrichment residual scenes. It did not enter G2 or boundary residual work.
## Summary
| Status | Count |
| --- | ---: |
| pass | 4 |
| fail-closed | 0 |
| source-unreadable | 0 |
| unknown | 0 |
## Scene Results
| Scene | Status | Readiness | Archetype | Missing Pieces |
| --- | --- | --- | --- | --- |
| 95598供电服务月报 | pass | A | paginated_enrichment | - |
| 故障报修工单信息统计表 | pass | A | paginated_enrichment | - |
| 输变电设备运行分析报告 | pass | A | paginated_enrichment | - |
| 巡视计划完成情况自动检索 | pass | A | paginated_enrichment | - |
## Implementation Slice
- Recovered G3 export methods ending with `Fn`, such as `excelExportFn`.
- Recovered G3 export methods ending with `ExcelFile`, such as `aSaveExcelFile`.
- Expanded G3 operational join-key hints to include report/org/user style keys when present in source evidence.
## Stop Statement
The four-scene route-local follow-up and report are published. No G2 or boundary residual work is started by this plan.