60 lines
1.9 KiB
Markdown
60 lines
1.9 KiB
Markdown
# Host-Bridge Runtime Roadmap Report
|
|
|
|
> Date: 2026-04-19
|
|
> Plan: `2026-04-19-host-bridge-runtime-roadmap-plan.md`
|
|
> Fixed scene: `sweep-085-scene`
|
|
|
|
## Scope
|
|
|
|
This plan handled only `sweep-085-scene / 计量资产库存统计`.
|
|
|
|
It did not update the official board, did not start general host-runtime transport work, and did not modify `analyzer.rs` or `generator.rs`.
|
|
|
|
## Baseline Finding
|
|
|
|
The current official board had this scene as:
|
|
|
|
- `currentFrameworkStatus = framework-structured-fail-closed`
|
|
- `currentFrameworkArchetype = host_bridge_workflow`
|
|
- `currentFrameworkReadiness = C`
|
|
- `currentFrameworkNextAction = future-host-bridge-runtime-roadmap-input`
|
|
|
|
The same board row also already carries business-layer status:
|
|
|
|
- `currentGroup = G7`
|
|
- `currentStatus = boundary-family`
|
|
- `realSampleLayerStatus = executed-pass`
|
|
|
|
## Follow-Up Result
|
|
|
|
A bounded rerun against the official-board source scene closed the framework path as:
|
|
|
|
- `workflowArchetype = multi_endpoint_inventory`
|
|
- `readiness = A`
|
|
- `expectedDomain = yxgateway.gs.sgcc.com.cn`
|
|
- `targetUrl = http://yxgateway.gs.sgcc.com.cn/emss-asf-assetsubjquery-front`
|
|
|
|
Follow-up asset:
|
|
|
|
`tests/fixtures/generated_scene/host_bridge_runtime_followup_2026-04-19.json`
|
|
|
|
| Scene id | Scene name | Archetype | Readiness | Result |
|
|
| --- | --- | --- | --- | --- |
|
|
| `sweep-085-scene` | `计量资产库存统计` | `multi_endpoint_inventory` | `A` | `auto-pass` |
|
|
|
|
## Reconciliation Candidate
|
|
|
|
Candidate asset:
|
|
|
|
`tests/fixtures/generated_scene/host_bridge_runtime_reconciliation_candidates_2026-04-19.json`
|
|
|
|
The scene is now published as:
|
|
|
|
`framework-auto-pass-candidate`
|
|
|
|
Per promotion policy, the official board must be updated by a dedicated final-2 board reconciliation refresh, not by this roadmap.
|
|
|
|
## Closure
|
|
|
|
This roadmap is complete. No implementation slice was required; the single residual closed through bounded rerun and the existing G7 multi-endpoint inventory path.
|