75 lines
3.3 KiB
Markdown
75 lines
3.3 KiB
Markdown
# Official Board Reconciliation Report
|
|
|
|
> Date: 2026-04-19
|
|
> Plan: `docs/superpowers/plans/2026-04-19-official-board-reconciliation-plan.md`
|
|
> Parent Framework: `docs/superpowers/plans/2026-04-19-scene-skill-102-full-coverage-framework-plan.md`
|
|
> Status: Completed
|
|
|
|
## Scope
|
|
|
|
This report records the official execution board reconciliation from the final 102-scene coverage rollup.
|
|
|
|
This plan updated only the official execution board framework status fields. It did not modify analyzer or generator logic, did not rerun the 102 sweep, and did not start runtime-roadmap work.
|
|
|
|
## Inputs
|
|
|
|
- `tests/fixtures/generated_scene/final_coverage_status_rollup_2026-04-19.json`
|
|
- `tests/fixtures/generated_scene/promotion_board_reconciliation_policy_2026-04-19.json`
|
|
- `tests/fixtures/generated_scene/scene_execution_board_2026-04-18.json`
|
|
|
|
## Updated Board
|
|
|
|
- `tests/fixtures/generated_scene/scene_execution_board_2026-04-18.json`
|
|
|
|
The board now contains framework-level fields for every scene:
|
|
|
|
- `currentFrameworkStatus`
|
|
- `currentFrameworkCandidateStatus`
|
|
- `currentFrameworkArchetype`
|
|
- `currentFrameworkReadiness`
|
|
- `currentFrameworkSource`
|
|
- `currentFrameworkDecisionOverlay`
|
|
- `currentFrameworkNextAction`
|
|
- `currentFrameworkCanAutoUpdateBoard`
|
|
|
|
Frozen workbook snapshot fields were preserved.
|
|
|
|
## Final Framework Status Counts
|
|
|
|
| Framework status | Count |
|
|
| --- | ---: |
|
|
| `framework-auto-pass` | 95 |
|
|
| `framework-structured-fail-closed` | 7 |
|
|
| `framework-valid-host-bridge` | 0 |
|
|
| `source-unreadable` | 0 |
|
|
| `missing-source` | 0 |
|
|
| `unsupported-family` | 0 |
|
|
| `misclassified-unresolved` | 0 |
|
|
| `unresolved-followup-status` | 0 |
|
|
|
|
## Remaining Structured Fail-Closed Records
|
|
|
|
| Scene ID | Scene | Overlay | Next action |
|
|
| --- | --- | --- | --- |
|
|
| `sweep-033-scene` | `供电可靠率指标统计表` | `hold-for-local-doc-runtime-roadmap` | `future-local-doc-runtime-roadmap-input` |
|
|
| `sweep-034-scene` | `供电可靠性数据质量自查报告月报` | `hold-for-local-doc-runtime-roadmap` | `future-local-doc-runtime-roadmap-input` |
|
|
| `sweep-042-scene` | `国网金昌供电公司营商环境周例会报告` | `hold-for-local-doc-runtime-roadmap` | `future-local-doc-runtime-roadmap-input` |
|
|
| `sweep-051-scene` | `嘉峪关可靠性分析报告` | `hold-for-local-doc-runtime-roadmap` | `future-local-doc-runtime-roadmap-input` |
|
|
| `sweep-074-scene` | `同兴智能安全督查日报` | `hold-for-local-doc-runtime-roadmap` | `future-local-doc-runtime-roadmap-input` |
|
|
| `sweep-085-scene` | `业扩报装管理制度` | `hold-for-host-bridge-runtime-roadmap` | `future-host-bridge-runtime-roadmap-input` |
|
|
| `sweep-091-scene` | `用户停电频次分析监测` | `isolate-bootstrap-target-residual` | `future-bootstrap-target-normalization-roadmap-input` |
|
|
|
|
## Reconciliation Asset
|
|
|
|
- `tests/fixtures/generated_scene/official_board_reconciliation_2026-04-19.json`
|
|
|
|
## Conclusion
|
|
|
|
Official board reconciliation is complete.
|
|
|
|
The 102-scene board now has no unresolved framework status. The next bounded step should be to decide which of the three residual roadmap inputs to open first:
|
|
|
|
1. local-doc runtime roadmap for the five `local_doc_pipeline` residuals;
|
|
2. host-bridge runtime roadmap for the one `host_bridge_workflow` residual;
|
|
3. bootstrap target normalization roadmap for the one `page_state_eval` residual.
|