53 lines
1.3 KiB
Markdown
53 lines
1.3 KiB
Markdown
# G6 Host-Bridge Entry Gate Design
|
|
|
|
> Date: 2026-04-19
|
|
> Status: Draft
|
|
> Upstream Report: [2026-04-19-g6-host-bridge-entry-readiness-report.md](D:/data/ideaSpace/rust/sgClaw/claw-new/docs/superpowers/reports/2026-04-19-g6-host-bridge-entry-readiness-report.md)
|
|
|
|
## 1. Intent
|
|
|
|
This design defines the next bounded slice after `G6 host-bridge entry readiness`.
|
|
|
|
The target is:
|
|
|
|
`G6 host-bridge entry gate`
|
|
|
|
## 2. Why This Slice
|
|
|
|
The semantic readiness criteria are now explicit.
|
|
|
|
The next bounded pressure is:
|
|
|
|
1. turn those criteria into a bounded future entry gate without opening real execution
|
|
|
|
## 3. Scope Boundary
|
|
|
|
This design is limited to gate modeling only.
|
|
|
|
It may include:
|
|
|
|
1. defining pass/fail gate conditions for a future `G6` entry slice
|
|
2. defining which readiness criteria are hard blockers
|
|
3. defining how the gate narrows later real-sample entry
|
|
|
|
It must not include:
|
|
|
|
1. executing a `G6` real sample
|
|
2. implementing host-runtime directly
|
|
3. opening `G8`
|
|
4. reopening `G7`
|
|
|
|
## 4. Target Outcome
|
|
|
|
The bounded target outcome is one state:
|
|
|
|
1. one bounded `G6 host-bridge entry gate` plan
|
|
|
|
## 5. Exit Condition
|
|
|
|
This design is complete when implementation can be bounded to one plan that:
|
|
|
|
1. freezes gate-model scope
|
|
2. defines bounded gate conditions
|
|
3. emits one bounded follow-up plan
|