751 B
751 B
G6 Host-Bridge Entry Readiness Closure Report
Date: 2026-04-19 Plan: 2026-04-19-g6-host-bridge-entry-readiness-plan.md
Result
This plan is closed with one bounded semantic-readiness threshold:
semantic-ready
What Was Closed
G6future entry prerequisites are now split into required vs optional-later- the minimum readiness threshold is now explicit
- one bounded follow-up
design + plannow exists
Hold Result
The following direction remains untouched:
G8 local-doc prerequisites
Next Step
Execute the bounded G6 host-bridge entry gate plan rather than reopening this readiness slice.