Files
claw/docs/superpowers/reports/2026-04-19-g6-host-bridge-entry-readiness-closure-report.md

27 lines
751 B
Markdown

# G6 Host-Bridge Entry Readiness Closure Report
> Date: 2026-04-19
> Plan: [2026-04-19-g6-host-bridge-entry-readiness-plan.md](D:/data/ideaSpace/rust/sgClaw/claw-new/docs/superpowers/plans/2026-04-19-g6-host-bridge-entry-readiness-plan.md)
## Result
This plan is closed with one bounded semantic-readiness threshold:
1. `semantic-ready`
## What Was Closed
1. `G6` future entry prerequisites are now split into required vs optional-later
2. the minimum readiness threshold is now explicit
3. one bounded follow-up `design + plan` now exists
## Hold Result
The following direction remains untouched:
1. `G8 local-doc prerequisites`
## Next Step
Execute the bounded `G6 host-bridge entry gate` plan rather than reopening this readiness slice.