Files
claw/docs/superpowers/specs/2026-04-19-host-bridge-runtime-roadmap-design.md

28 lines
705 B
Markdown

# Host-Bridge Runtime Roadmap Design
> Date: 2026-04-19
> Parent Sequence: `2026-04-19-final-2-residual-child-plan-sequence-plan.md`
> Fixed Scene: `sweep-085-scene`
## Intent
Close or narrow the remaining host-bridge runtime residual without resurrecting the old G6 semantics micro-plan chain.
## Fixed Scope
Only `sweep-085-scene` is in scope.
## Minimal Success Definition
The scene must either:
1. become `framework-auto-pass-candidate`; or
2. remain `framework-structured-fail-closed` with a narrower named host-bridge runtime hold.
## Forbidden Scope
1. no general host-runtime transport implementation
2. no new G6 semantics micro-plan
3. no changes to G1-E/G2/G3 routes
4. no new family