1.8 KiB
1.8 KiB
Final 2 Residual Child Plan Sequence Plan
Date: 2026-04-19 Parent Framework:
2026-04-19-scene-skill-102-full-coverage-framework-plan.mdParent Layer:Layer E / Route 5 + Route 6Status: Draft
Plan Intent
Create the remaining child-plan sequence for the last two framework structured fail-closed residuals. This plan only defines the sequence and child plan boundaries; it does not execute implementation.
Fixed Inputs
tests/fixtures/generated_scene/scene_execution_board_2026-04-18.jsontests/fixtures/generated_scene/local_doc_official_board_reconciliation_refresh_2026-04-19.json
Fixed Residual Bucket
sweep-085-scene:host_bridge_workflow,future-host-bridge-runtime-roadmap-inputsweep-091-scene:page_state_eval,future-bootstrap-target-normalization-roadmap-input
Child Plans
2026-04-19-final-2-residual-roadmap-prioritization-plan.md2026-04-19-bootstrap-target-normalization-roadmap-plan.md2026-04-19-host-bridge-runtime-roadmap-plan.md2026-04-19-final-2-official-board-reconciliation-refresh-plan.md2026-04-19-102-framework-closure-rollup-plan.md
Scope Guardrails
- Do not modify
analyzer.rs. - Do not modify
generator.rs. - Do not update the official board under this sequence-definition plan.
- Do not run a full 102 sweep under this plan.
- Do not reopen G1-E, G2, G3, or local-doc runtime work.
- Do not continue the old G6 micro-plan chain.
Completion Criteria
- The final-2 residual child plan sequence exists.
- Each child plan declares parent route, fixed input bucket, allowed files, forbidden files, expected delta, and stop statement.
- The next executable child plan is the prioritization plan.
Stop Statement
Stop after the final-2 child plan sequence is created. Do not execute any child plan under this sequence-definition plan.