1.2 KiB
1.2 KiB
Final 2 Residual Roadmap Prioritization Plan
Date: 2026-04-19 Parent Framework:
2026-04-19-scene-skill-102-full-coverage-framework-plan.mdParent Sequence:2026-04-19-final-2-residual-child-plan-sequence-plan.mdStatus: Draft
Plan Intent
Select the next residual roadmap from the final two structured fail-closed records.
Fixed Input Bucket
sweep-085-scene: host-bridge runtime residualsweep-091-scene: bootstrap target normalization residual
Allowed Files
tests/fixtures/generated_scene/final_2_residual_roadmap_prioritization_2026-04-19.jsondocs/superpowers/reports/2026-04-19-final-2-residual-roadmap-prioritization-report.md
Forbidden Files
src/generated_scene/analyzer.rssrc/generated_scene/generator.rstests/fixtures/generated_scene/scene_execution_board_2026-04-18.json
Tasks
- Load the current official board.
- Extract the two residuals.
- Score bootstrap normalization vs host-bridge runtime.
- Select exactly one first roadmap.
- Publish decision JSON.
- Publish decision report.
Expected Delta
No coverage delta. This is a decision-only plan.
Stop Statement
Stop after the prioritization asset and report are published. Do not start the selected roadmap under this plan.