Files
claw/docs/superpowers/plans/2026-04-19-final-2-residual-roadmap-prioritization-plan.md

1.2 KiB

Final 2 Residual Roadmap Prioritization Plan

Date: 2026-04-19 Parent Framework: 2026-04-19-scene-skill-102-full-coverage-framework-plan.md Parent Sequence: 2026-04-19-final-2-residual-child-plan-sequence-plan.md Status: Draft

Plan Intent

Select the next residual roadmap from the final two structured fail-closed records.

Fixed Input Bucket

  1. sweep-085-scene: host-bridge runtime residual
  2. sweep-091-scene: bootstrap target normalization residual

Allowed Files

  1. tests/fixtures/generated_scene/final_2_residual_roadmap_prioritization_2026-04-19.json
  2. docs/superpowers/reports/2026-04-19-final-2-residual-roadmap-prioritization-report.md

Forbidden Files

  1. src/generated_scene/analyzer.rs
  2. src/generated_scene/generator.rs
  3. tests/fixtures/generated_scene/scene_execution_board_2026-04-18.json

Tasks

  1. Load the current official board.
  2. Extract the two residuals.
  3. Score bootstrap normalization vs host-bridge runtime.
  4. Select exactly one first roadmap.
  5. Publish decision JSON.
  6. Publish decision report.

Expected Delta

No coverage delta. This is a decision-only plan.

Stop Statement

Stop after the prioritization asset and report are published. Do not start the selected roadmap under this plan.