G6 Host-Bridge Entry Gate Plan

Date: 2026-04-19 Status: Draft Upstream Spec: 2026-04-19-g6-host-bridge-entry-gate-design.md

Plan Intent

This plan executes one bounded next slice:

G6 host-bridge entry gate

Scope Guardrails

  1. do not execute a G6 real sample
  2. do not implement host-runtime directly
  3. do not open G8
  4. do not reopen G7
  5. do not open G4 / G5

Workstreams

  1. WS1 Freeze entry-gate scope
  2. WS2 Define bounded gate conditions
  3. WS3 Publish one bounded gate result

Phase 0: Freeze the Boundary

Objective

Lock the plan to entry-gate modeling only.

Tasks

  1. freeze G6 as the only target
  2. freeze implementation and real execution as out of scope

Acceptance Criteria

  1. no broader host-runtime work begins under this plan

Phase 1: Define Gate Conditions

Objective

Turn the semantic readiness criteria into bounded gate conditions.

Tasks

  1. define hard gate conditions
  2. define soft/optional later conditions
  3. define fail-close gate reasons

Acceptance Criteria

  1. entry-gate conditions are explicit and bounded

Phase 2: Publish the Bounded Result

Objective

Turn the gate model into one bounded next artifact.

Tasks

  1. publish the gate result
  2. if needed, publish the next bounded follow-up plan

Acceptance Criteria

  1. the next step remains narrower than direct host-runtime implementation