G6 Host-Bridge Entry Gate Plan
Date: 2026-04-19 Status: Draft Upstream Spec: 2026-04-19-g6-host-bridge-entry-gate-design.md
Plan Intent
This plan executes one bounded next slice:
G6 host-bridge entry gate
Scope Guardrails
- do not execute a
G6real sample - do not implement host-runtime directly
- do not open
G8 - do not reopen
G7 - do not open
G4 / G5
Workstreams
WS1Freeze entry-gate scopeWS2Define bounded gate conditionsWS3Publish one bounded gate result
Phase 0: Freeze the Boundary
Objective
Lock the plan to entry-gate modeling only.
Tasks
- freeze
G6as the only target - freeze implementation and real execution as out of scope
Acceptance Criteria
- no broader host-runtime work begins under this plan
Phase 1: Define Gate Conditions
Objective
Turn the semantic readiness criteria into bounded gate conditions.
Tasks
- define hard gate conditions
- define soft/optional later conditions
- define fail-close gate reasons
Acceptance Criteria
- entry-gate conditions are explicit and bounded
Phase 2: Publish the Bounded Result
Objective
Turn the gate model into one bounded next artifact.
Tasks
- publish the gate result
- if needed, publish the next bounded follow-up plan
Acceptance Criteria
- the next step remains narrower than direct host-runtime implementation