G6 Host-Bridge Entry Readiness Plan

Date: 2026-04-19 Status: Draft Upstream Spec: 2026-04-19-g6-host-bridge-entry-readiness-design.md

Plan Intent

This plan executes one bounded next slice:

G6 host-bridge entry readiness

Scope Guardrails

  1. do not execute a G6 real sample
  2. do not implement host-runtime directly
  3. do not open G8
  4. do not reopen G7
  5. do not open G4 / G5

Workstreams

  1. WS1 Freeze entry-readiness scope
  2. WS2 Define bounded readiness criteria
  3. WS3 Publish one bounded readiness result

Phase 0: Freeze the Boundary

Objective

Lock the plan to entry-readiness only.

Tasks

  1. freeze G6 as the only target
  2. freeze implementation and real execution as out of scope

Acceptance Criteria

  1. no broader host-runtime work begins under this plan

Phase 1: Define Readiness Criteria

Objective

Turn the explicit callback verification model into bounded entry-readiness criteria.

Tasks

  1. define which semantics are required before G6 entry can open
  2. define which semantics remain optional
  3. define the minimal readiness threshold

Acceptance Criteria

  1. entry-readiness criteria are explicit and bounded

Phase 2: Publish the Bounded Result

Objective

Turn the readiness model into one bounded next artifact.

Tasks

  1. publish the readiness result
  2. if needed, publish the next bounded follow-up plan

Acceptance Criteria

  1. the next step remains narrower than direct host-runtime implementation