Local-Doc Runtime Roadmap Plan
Date: 2026-04-19 Parent Decision:
2026-04-19-residual-runtime-roadmap-prioritization-plan.mdParent Residual Bucket:local_doc_pipelineStatus: Draft
Plan Intent
Plan the bounded closure path for the five local_doc_pipeline residuals selected by the residual runtime roadmap prioritization decision.
Fixed Input Bucket
Only these scenes are in scope:
sweep-033-scenesweep-034-scenesweep-042-scenesweep-051-scenesweep-074-scene
Initial Phases
Phase 0: Freeze Local-Doc Residual Baseline
Capture current generation reports and missing pieces for the five scenes.
Phase 1: Local-Doc Evidence Inventory
Classify document source, attachment dependency, local service dependency, and output artifact expectation.
Phase 2: Minimal Local-Doc Contract Design
Define the smallest contract that can distinguish runnable local-doc pipelines from policy-held local-doc pipelines.
Phase 3: Bounded Implementation Slice
Implement only the contract recovery or fail-closed detail required by the five-scene bucket.
Phase 4: Follow-Up Sweep And Reconciliation
Rerun only the five target scenes and publish candidates. Do not update the official board inside this phase.
Forbidden Scope
- host-bridge runtime roadmap;
- bootstrap target normalization;
- G4/G5;
- full attachment runtime implementation unless explicitly required by the minimal contract;
- official board update.
Stop Statement
Stop after the local-doc five-scene follow-up and reconciliation candidates are published. A later official board reconciliation plan must consume the result.