Files
claw/docs/superpowers/plans/2026-04-19-residual-13-followup-sweep-and-reconciliation-plan.md

1013 B

Residual 13 Follow-Up Sweep And Reconciliation Plan

Date: 2026-04-19 Status: Draft Parent Plan: docs/superpowers/plans/2026-04-19-structured-fail-closed-residual-13-closure-plan.md Parent Route: Residual Route E Parent Layer: Layer E

Plan Intent

Measure the cumulative delta after residual Routes A through D complete.

Fixed Input Bucket

The fixed input bucket is the same 13 residual scenes from the parent residual closure plan.

Allowed Files

  1. residual follow-up JSON asset
  2. residual reconciliation candidate JSON asset
  3. residual follow-up report
  4. residual reconciliation report

Forbidden Files

  1. src/generated_scene/analyzer.rs
  2. src/generated_scene/generator.rs
  3. tests/fixtures/generated_scene/scene_execution_board_2026-04-18.json

Tasks

  1. rerun the fixed 13 residual scenes;
  2. classify raw statuses;
  3. apply promotion policy;
  4. report remaining residual count.

Stop Statement

Stop after residual follow-up and reconciliation reports.