Residual 13 Follow-Up Sweep And Reconciliation Plan
Date: 2026-04-19 Status: Draft Parent Plan:
docs/superpowers/plans/2026-04-19-structured-fail-closed-residual-13-closure-plan.mdParent Route:Residual Route EParent Layer:Layer E
Plan Intent
Measure the cumulative delta after residual Routes A through D complete.
Fixed Input Bucket
The fixed input bucket is the same 13 residual scenes from the parent residual closure plan.
Allowed Files
- residual follow-up JSON asset
- residual reconciliation candidate JSON asset
- residual follow-up report
- residual reconciliation report
Forbidden Files
src/generated_scene/analyzer.rssrc/generated_scene/generator.rstests/fixtures/generated_scene/scene_execution_board_2026-04-18.json
Tasks
- rerun the fixed 13 residual scenes;
- classify raw statuses;
- apply promotion policy;
- report remaining residual count.
Stop Statement
Stop after residual follow-up and reconciliation reports.