Structured Fail-Closed Residual 13 Closure Plan
Date: 2026-04-19 Status: Draft Parent Framework:
docs/superpowers/plans/2026-04-19-scene-skill-102-full-coverage-framework-plan.mdUpstream Design:docs/superpowers/specs/2026-04-19-structured-fail-closed-residual-13-closure-design.mdFixed Input:tests/fixtures/generated_scene/full_coverage_reconciliation_candidates_2026-04-19.json
Plan Intent
Turn the remaining 13 framework-structured-fail-closed scenes into a controlled residual closure sequence.
This plan is a coordinator plan. It does not directly implement code. Implementation must happen only in bounded child plans declared below.
Fixed Input Bucket
The fixed input bucket is the 13 scenes with:
reconciliationCandidateStatus = framework-structured-fail-closed
from:
tests/fixtures/generated_scene/full_coverage_reconciliation_candidates_2026-04-19.json
Residual Routes
Residual Route A: G3 Residual Closure
Fixed input:
sweep-007-scene/95598供电服务月报sweep-039-scene/故障报修工单信息统计表sweep-068-scene/输变电设备运行分析报告sweep-084-scene/巡视计划完成情况自动检索
Expected child plan:
2026-04-19-g3-residual-4-workflow-evidence-closure-plan.md
Allowed implementation area:
- G3 workflow evidence recovery.
- G3 contract assembly.
- bounded G3 route-local validation.
Forbidden:
- G8 runtime.
- G6 host bridge runtime.
- new family creation.
Residual Route B: G2 Residual Closure
Fixed input:
sweep-018-scene/白银线损周报sweep-071-scene/台区线损大数据-月_周累计线损率统计分析
Expected child plan:
2026-04-19-g2-residual-2-readiness-closure-plan.md
Allowed implementation area:
- G2 readiness interpretation.
- G2 mode/request/response contract correction.
- bounded G2 route-local validation.
Forbidden:
- changing G2 real-sample pass semantics;
- adding a new G2 variant family;
- route drift into host bridge.
Residual Route C: Boundary Residual Decision
Fixed input:
sweep-033-scene/供电可靠率指标统计表sweep-034-scene/供电可靠性数据质量自查报告月报sweep-042-scene/国网金昌供电公司营商环境周例会报告sweep-051-scene/嘉峪关可靠性分析报告sweep-074-scene/同兴智能安全督查日报sweep-085-scene/业扩报装管理制度
Expected child plan:
2026-04-19-boundary-residual-hold-decision-plan.md
Allowed action:
- decision-only hold/defer classification.
- no implementation.
Residual Route D: Bootstrap Residual Isolation
Fixed input:
sweep-091-scene/用户停电频次分析监测
Expected child plan:
2026-04-19-bootstrap-target-residual-isolation-plan.md
Allowed action:
- bootstrap target isolation.
- no login recovery implementation.
Residual Route E: Residual Follow-Up Reconciliation
Expected child plan:
2026-04-19-residual-13-followup-sweep-and-reconciliation-plan.md
Allowed action:
- route-local or fixed 13-scene follow-up sweep.
- reconciliation candidate refresh.
- no official board update.
Phase Order
- Run Residual Route A.
- Run Residual Route B.
- Run Residual Route C.
- Run Residual Route D.
- Run Residual Route E.
Do not skip to Route E before Routes A through D are complete.
Deliverables
- residual 13 design.
- residual 13 coordinator plan.
- child bounded plans for Routes A through E.
Completion Criteria
- the 13 residual scenes are fully assigned to residual routes;
- every residual route has an expected child plan name;
- mainline residuals are separated from boundary/bootstrap residuals;
- no implementation is performed directly by this coordinator plan.
Stop Statement
Stop after publishing this coordinator plan and its child plan skeletons.
Do not modify implementation files under this coordinator plan.