# Boundary Runtime Prerequisites Roadmap Closure Report
> Date: 2026-04-19
> Roadmap: [2026-04-19-boundary-runtime-prerequisites-roadmap-plan.md](D:/data/ideaSpace/rust/sgClaw/claw-new/docs/superpowers/plans/2026-04-19-boundary-runtime-prerequisites-roadmap-plan.md)
## Result
This roadmap is closed with one bounded next direction:
1. `G6 host-bridge prerequisites`
## What Was Closed
1. `G6` and `G8` no longer compete ambiguously at the prerequisite level
2. one follow-up bounded `design + plan` now exists for the selected prerequisite direction
## Hold Result
The following direction remains held:
1. `G8 local-doc prerequisites`
The deferred families remain untouched:
1. `G4`
2. `G5`
## Next Step
Execute the bounded `G6 host-bridge prerequisites` plan rather than reopening this roadmap.