# G3 Residual Contract Closure Design
> Date: 2026-04-19
> Status: Draft
> Parent Framework Plan: `docs/superpowers/plans/2026-04-19-scene-skill-102-full-coverage-framework-plan.md`
> Parent Route: `Route 2: G3 / paginated_enrichment`
> Parent Layer: `Layer C + Layer D`
## Intent
Handle the remaining `G3` fail-closed records that are still unresolved after the enrichment-request and export-plan child plans have finished.
## Fixed Input Bucket
Residual `G3 / paginated_enrichment` records after:
1. `G3 enrichment-request closure`
2. `G3 export-plan closure`
Expected residual themes:
1. `g3_runtime_scope`
2. `join_key`
3. mixed residual contract blockers
## Allowed Files
1. `src/generated_scene/analyzer.rs`
2. `src/generated_scene/generator.rs`
3. `src/generated_scene/ir.rs`
4. `tests/scene_generator_test.rs`
5. route-local residual inventory and report assets
## Forbidden Files
1. `tests/fixtures/generated_scene/scene_execution_board_2026-04-18.json`
2. Route 3+ plan files
## Expected Delta
1. reduce the residual Route 2 bucket after the first two child plans
2. or explicitly defer a smaller residual set with named blockers
## Stop Rule
Stop when:
1. the residual Route 2 bucket is either materially reduced, or
2. the remaining residual Route 2 scenes are explicitly named and deferred
After this point, Route 2 is considered complete or deferred.