G2 Residual 2 Readiness Closure Plan

Date: 2026-04-19 Status: Draft Parent Plan: docs/superpowers/plans/2026-04-19-structured-fail-closed-residual-13-closure-plan.md Parent Route: Residual Route B Parent Layer: Layer C

Plan Intent

Close the 2 remaining G2 / multi_mode_request structured fail-closed records by correcting bounded readiness or contract interpretation.

Fixed Input Bucket

  1. sweep-018-scene / 白银线损周报
  2. sweep-071-scene / 台区线损大数据-月_周累计线损率统计分析

Allowed Files

  1. src/generated_scene/analyzer.rs
  2. src/generated_scene/generator.rs
  3. tests/scene_generator_test.rs
  4. route-local follow-up JSON/report assets

Forbidden Files

  1. tests/fixtures/generated_scene/scene_execution_board_2026-04-18.json
  2. G3/G6/G8 route code unless required to preserve regression tests
  3. family baseline manifests

Tasks

  1. inspect the two fixed G2 residuals;
  2. determine whether readiness labels 02 and 00 are report parsing artifacts or real contract gaps;
  3. implement one bounded G2 correction if justified;
  4. rerun only the two fixed scenes;
  5. publish delta report.

Expected Coverage Delta

Target: reduce the 2 G2 residual fail-closed records.

Stop Statement

Stop after the two-scene route-local follow-up and report.

Do not continue into G1-E, G3, or boundary work.