49 lines
1.4 KiB
Markdown
49 lines
1.4 KiB
Markdown
# G2 Residual 2 Readiness Closure Plan
|
|
|
|
> Date: 2026-04-19
|
|
> Status: Draft
|
|
> Parent Plan: `docs/superpowers/plans/2026-04-19-structured-fail-closed-residual-13-closure-plan.md`
|
|
> Parent Route: `Residual Route B`
|
|
> Parent Layer: `Layer C`
|
|
|
|
## Plan Intent
|
|
|
|
Close the `2` remaining `G2 / multi_mode_request` structured fail-closed records by correcting bounded readiness or contract interpretation.
|
|
|
|
## Fixed Input Bucket
|
|
|
|
1. `sweep-018-scene` / `白银线损周报`
|
|
2. `sweep-071-scene` / `台区线损大数据-月_周累计线损率统计分析`
|
|
|
|
## Allowed Files
|
|
|
|
1. `src/generated_scene/analyzer.rs`
|
|
2. `src/generated_scene/generator.rs`
|
|
3. `tests/scene_generator_test.rs`
|
|
4. route-local follow-up JSON/report assets
|
|
|
|
## Forbidden Files
|
|
|
|
1. `tests/fixtures/generated_scene/scene_execution_board_2026-04-18.json`
|
|
2. G3/G6/G8 route code unless required to preserve regression tests
|
|
3. family baseline manifests
|
|
|
|
## Tasks
|
|
|
|
1. inspect the two fixed G2 residuals;
|
|
2. determine whether readiness labels `02` and `00` are report parsing artifacts or real contract gaps;
|
|
3. implement one bounded G2 correction if justified;
|
|
4. rerun only the two fixed scenes;
|
|
5. publish delta report.
|
|
|
|
## Expected Coverage Delta
|
|
|
|
Target: reduce the `2` G2 residual fail-closed records.
|
|
|
|
## Stop Statement
|
|
|
|
Stop after the two-scene route-local follow-up and report.
|
|
|
|
Do not continue into G1-E, G3, or boundary work.
|
|
|