# G2 Residual 2 Readiness Closure Plan
> Date: 2026-04-19
> Status: Draft
> Parent Plan: `docs/superpowers/plans/2026-04-19-structured-fail-closed-residual-13-closure-plan.md`
> Parent Route: `Residual Route B`
> Parent Layer: `Layer C`
## Plan Intent
Close the `2` remaining `G2 / multi_mode_request` structured fail-closed records by correcting bounded readiness or contract interpretation.
## Fixed Input Bucket
1. `sweep-018-scene` / `白银线损周报`
2. `sweep-071-scene` / `台区线损大数据-月_周累计线损率统计分析`
## Allowed Files
1. `src/generated_scene/analyzer.rs`
2. `src/generated_scene/generator.rs`
3. `tests/scene_generator_test.rs`
4. route-local follow-up JSON/report assets
## Forbidden Files
1. `tests/fixtures/generated_scene/scene_execution_board_2026-04-18.json`
2. G3/G6/G8 route code unless required to preserve regression tests
3. family baseline manifests
## Tasks
1. inspect the two fixed G2 residuals;
2. determine whether readiness labels `02` and `00` are report parsing artifacts or real contract gaps;
3. implement one bounded G2 correction if justified;
4. rerun only the two fixed scenes;
5. publish delta report.
## Expected Coverage Delta
Target: reduce the `2` G2 residual fail-closed records.
## Stop Statement
Stop after the two-scene route-local follow-up and report.