G2 Residual 2 Readiness Closure Plan
Date: 2026-04-19 Status: Draft Parent Plan:
docs/superpowers/plans/2026-04-19-structured-fail-closed-residual-13-closure-plan.mdParent Route:Residual Route BParent Layer:Layer C
Plan Intent
Close the 2 remaining G2 / multi_mode_request structured fail-closed records by correcting bounded readiness or contract interpretation.
Fixed Input Bucket
sweep-018-scene/白银线损周报sweep-071-scene/台区线损大数据-月_周累计线损率统计分析
Allowed Files
src/generated_scene/analyzer.rssrc/generated_scene/generator.rstests/scene_generator_test.rs- route-local follow-up JSON/report assets
Forbidden Files
tests/fixtures/generated_scene/scene_execution_board_2026-04-18.json- G3/G6/G8 route code unless required to preserve regression tests
- family baseline manifests
Tasks
- inspect the two fixed G2 residuals;
- determine whether readiness labels
02and00are report parsing artifacts or real contract gaps; - implement one bounded G2 correction if justified;
- rerun only the two fixed scenes;
- publish delta report.
Expected Coverage Delta
Target: reduce the 2 G2 residual fail-closed records.
Stop Statement
Stop after the two-scene route-local follow-up and report.
Do not continue into G1-E, G3, or boundary work.